What should happen during an alarm, isolation, shutdown or restart?

Read the action, authority, stop condition and success check together before an alarm, shutdown or restart.

02 of 09

Before you act

What you need to know

Respond to a leak alarm

Keep clear of standing water where electrical equipment may be affected.

Identify the affected area, note the asset ID and check whether automatic isolation has stopped the flow.

Do not force a valve or repeat-reset a device. Call the 24 hour line if the source is unclear, access is unsafe or isolation has not occurred.

Source: Example Building 001 commissioning record EB-A-COMM-014; Wireless leak detector user manual pp. 2-4

Isolation hierarchy

Use the authorised local-then-riser sequence. A resident may reopen only their own flat valve, and only once the cause is cleared and the area is dry, and must not force an actuator or override lever.

A building operator or competent responder confirms the local state before considering the riser route.

Do not operate the incoming main without competent direction after local and riser routes have been exhausted.

Source: Example Building 001 isolation drawing EB-A-WS-02

Safe shutdown

Building operator or competent responder only. Confirm the affected location, asset serial and paired project record before acting.

Observe the indication and valve state. Stop if access is unsafe, a valve resists, the source is unknown or electrical equipment may be affected.

Success means flow has stopped in the affected area and the isolated state is recorded.

Source: Example Building 001 device schedule EB-WS-SCH-01

Restart and return to service

Restart only after the cause is cleared, the area is dry, electrical risk is absent and competent authority has confirmed the route.

Open only the authorised project valve and observe the affected area. Stop after any repeat alarm and escalate.

Record the asset serial, isolation state and measured result before return to service.

Source: Example Building 001 commissioning record EB-A-COMM-014

Handover checks

The client checks the current issue, outstanding limitations, maintenance evidence and responsible party at handover and after each revision.

Source: Example Building 001 evidence register

This fictional sample shows the format of an OM Manuals handover.