Section 06
Troubleshooting
What safe check is permitted for this symptom, and when must I stop?
Start with the symptom and read the safe check, authorised action, stop condition, success check and escalation together.
06 of 09
Project schedules
The recorded detail
Open any row to see its full detail.
Safe first checks and escalationSchedule 01 of 017 rows6 columns
| Symptom (zone and asset) | Safe first checks | Authorised action | Stop - do not proceed if | Success check | Escalate to and drawing or document |
|---|---|---|---|---|---|
| Alarm and project isolation recorded - affected zone asset | Keep clear of water near electrics; identify flat or riser | Leave the recorded isolation state unchanged and call the front desk | Water is near electrics or the source is not visible | Flow stops and the project isolation state is recorded | 24 hour line - EB-A-GF-01 |
| Alarm and expected project isolation did not occur - affected zone asset | Observe visible indication and isolation state only | Call the 24 hour line; operator follows the controlled local-then-riser route | A control resists, access is unsafe or source is unclear | Lowest safe project isolation stops flow | 24 hour line - EB-A-WS-02 |
| Project isolation recorded but no visible water - affected zone | Check accessible dry areas and asset identity | Keep isolated pending competent inspection | Changing state could release concealed water | Cause is found and area remains safe | Technical support - project records |
| Water restored but alarm repeats - affected zone sensing point | Stop after the first repeat alarm and record the visible indication | Leave the controlled local isolation unchanged and escalate | Any repeat alarm occurs | System remains safely isolated without further action | 24 hour line - EB-A-CS-03 |
| Project asset has no visible indication - affected zone | Check only the visible indication and safe local supply state | Keep zone under observation and call support | Electrical access or live work would be needed | Competent person records the restored normal indication | Technical support - controlled document register |
| Project register unavailable but local state appears normal - affected zone | Confirm the visible local indication and recorded normal isolation state | Use the controlled offline evidence and report the register fault | Local state is abnormal or uncertain | Local project state remains normal and the fault is logged | Technical support - current manual issue |
| Riser alarm affecting more than one flat - Zone R1 or R2 | Confirm riser and affected flats from schedule | Operator follows authorised project riser isolation | Riser isolation fails or incoming-main action is considered | Affected riser flow stops | 24 hour line - EB-A-WS-02 |
Project records
Symptom records
Alarm and project isolation recorded - affected zone asset
Safe check and stop boundary
- Symptom (zone and asset)
- Alarm and project isolation recorded - affected zone asset
- Safe first checks
- Keep clear of water near electrics; identify flat or riser
- Authorised action
- Leave the recorded isolation state unchanged and call the front desk
- Stop - do not proceed if
- Water is near electrics or the source is not visible
- Success check
- Flow stops and the project isolation state is recorded
- Escalate to and drawing or document
- 24 hour line - EB-A-GF-01
Source: Example Building 001 safe first checks schedule
Alarm and expected project isolation did not occur - affected zone asset
Safe check and stop boundary
- Symptom (zone and asset)
- Alarm and expected project isolation did not occur - affected zone asset
- Safe first checks
- Observe visible indication and isolation state only
- Authorised action
- Call the 24 hour line; operator follows the controlled local-then-riser route
- Stop - do not proceed if
- A control resists, access is unsafe or source is unclear
- Success check
- Lowest safe project isolation stops flow
- Escalate to and drawing or document
- 24 hour line - EB-A-WS-02
Source: Example Building 001 safe first checks schedule
Project isolation recorded but no visible water - affected zone
Safe check and stop boundary
- Symptom (zone and asset)
- Project isolation recorded but no visible water - affected zone
- Safe first checks
- Check accessible dry areas and asset identity
- Authorised action
- Keep isolated pending competent inspection
- Stop - do not proceed if
- Changing state could release concealed water
- Success check
- Cause is found and area remains safe
- Escalate to and drawing or document
- Technical support - project records
Source: Example Building 001 safe first checks schedule
Water restored but alarm repeats - affected zone sensing point
Safe check and stop boundary
- Symptom (zone and asset)
- Water restored but alarm repeats - affected zone sensing point
- Safe first checks
- Stop after the first repeat alarm and record the visible indication
- Authorised action
- Leave the controlled local isolation unchanged and escalate
- Stop - do not proceed if
- Any repeat alarm occurs
- Success check
- System remains safely isolated without further action
- Escalate to and drawing or document
- 24 hour line - EB-A-CS-03
Source: Example Building 001 safe first checks schedule
Project asset has no visible indication - affected zone
Safe check and stop boundary
- Symptom (zone and asset)
- Project asset has no visible indication - affected zone
- Safe first checks
- Check only the visible indication and safe local supply state
- Authorised action
- Keep zone under observation and call support
- Stop - do not proceed if
- Electrical access or live work would be needed
- Success check
- Competent person records the restored normal indication
- Escalate to and drawing or document
- Technical support - controlled document register
Source: Example Building 001 safe first checks schedule
Riser alarm affecting more than one flat - Zone R1 or R2
Safe check and stop boundary
- Symptom (zone and asset)
- Riser alarm affecting more than one flat - Zone R1 or R2
- Safe first checks
- Confirm riser and affected flats from schedule
- Authorised action
- Operator follows authorised project riser isolation
- Stop - do not proceed if
- Riser isolation fails or incoming-main action is considered
- Success check
- Affected riser flow stops
- Escalate to and drawing or document
- 24 hour line - EB-A-WS-02
Source: Example Building 001 safe first checks schedule
This fictional sample shows the format of an OM Manuals handover.